A SpringLock consists of a Bridge and a Lock. It is typically installed on the back of a frame either in pairs (Side by Side method) or, at the bottom of a frame, with Hang Plate method). They lock on to screws in the wall. (Installation Instructions available, just contact our office)
BRIDGE – Screw to frame. Head of screw in wall passes through. LOCK – Pushes into the Bridge to lock onto screw in wall.